—Location of Security Check: Main entries of building, Basement entry (for vehicles), Lift lobby entries at basement
—Provision for Security Cameras Across the Development: Yes, provided
—Chillers: Yes, 400 Tr x 3 Nos
—Cooling Towers: Yes, 4 Nos
—HVAC Specifications: Water cooled chillers
—Design Temperature (Internal): 23.3 ± 1 Degrees
—Space Provision for Precision AC Units: Not in common area
—Two-way Signal Capability for BMS/Fire Alarm: Yes
—Integration of BMS/Fire Alarm with Tenant’s: Yes
—Number of Hydrants per Floor: 8 Nos
—Tank Capacity of Fire Hydrant/Capacity of UG Tanks: 375KL + 325KL Fire UGT, 20KL Fire OHT,
Raw water UGT-2x45KL, Treated Domestic water UGT 2x45KL, 5KL OHT
—Number of Risers per Floor and Water Pressure: 4 Nos, 1.5 bar - 3.5 Bar pressure
—Fire Control Room: Yes, at ground floor
—Availability of Fire Resistant Doors with Rating in Fire Prone Areas: Yes, as per NBC
—Capacity of the Fuel Storage: 4 Nos x 990 Liter diesel for DG sets
—Sprinklers, Quantity: Yes
—Carbon Monoxide Sensors in Basements: Yes, in basement
—Location Where Integrated Fire Alarm and Public Address System Are Present: At ground floor
—Number of Pressurized Escape Stairs: 08 Nos
—Number of Refuge Areas: 01 No.
—Pressurization of Enclosed Stairs, Lift Lobbies and Lift Shafts: Yes
—Primary Source of Power to Building: BSES substation
—Machine and Load of HT Power: 11KV Power supply
—Number of Transformers with Capacity: 3 Nos x 1600KVA
—Number of DG Sets: 4 Nos
—Make of DG Sets and DG Configuration: Make not finalized, 1x750KVA, 1x1010KVA, 2x1500KVA
—Capacity of DG Sets: 4760KVA total
—Number of Electrical Rooms: 28 Nos
—Design Load Total Assumption: Max demand load - 3428KW
—Inbuilt Fire Suppression System in Main/LT Panels: Yes
—Transformers and LT Panels on Ground Floor: No, in basement
—Client to be Charged on HT Rate/LT Rate: Not specified
—Possibility of Getting Additional Electricity Load and Its Cost: Not specified
—Substation: Yes
—Hierarchy for Electricity Supply in the Schematic: Main power from BSES & DG sets for emergency power backup
—Mode of Electricity Supply: BSES substation, 11KV
—Retail Amenities: Not specified
—Stage of Delivering Fit Outs: Warm shell
—Provision and Arrangements of Electricity During Fit Outs: Not specified
—Number of Entrances: 2 Nos full height North & South Atrium & Club lobby entrance
—Rain Shelters from Drop-off Points to Building Shelters: Drop-off location has been provided as per Aerocity Concept Plan